-
Kansas Dome
The state legislature approved the dome in 1881 and construction began in 1885. The outer copper dome extends approximately 75 feet above the inner dome. There are 296 steps to the top of the dome.
More >

-
Ad Astra
"Ad Astra per Aspera," from the Latin for "To the Stars through Difficulties" is the state motto of Kansas. Richard Bergen's bronze sculpture takes its name from this motto and and reflects Kansas's American Indian heritage.
More >

-
Kansas House of Representatives
The House of Representatives is home to the state legislators who are elected every two years and was completed in the early 1880s. This was the second of the Capitol's
four wings to be completed.
More >

-
Kansas Senate
The Kansas Senate has 40 members elected every four years. The Senate Chamber is located in the east wing, the oldest wing of the Capitol, completed in 1873. The latest renovation was completed in 2005.
More >

-
Kansas State Capitol, Topeka
The Kansas State Capitol was voted one of the 8 Wonders of Kansas Architecture because our forefathers had the vision and boldness to have such a magnificent structure designed.
More >

-
John Steuart Curry Mural
"Tragic Prelude," is Curry's interpretation of John Brown and the anti-slavery movement in Kansas Territory and he considered the murals in the State Capitol his greatest work.
More >

Results for '700k fc coins Visit Buyfc26coins.com for latest FC 26 coins news..gtUo' - 8771 to 8780 of 10000, consider revising search criteria
and State Affairs
Dana Rooney, Committee Assistant–785-368-7166
346-S
9:00 AM
Tuesday, January 26...
January 26, 2016
Written Testimony in Favor of HB2468
Abigail Klausmeyer, 12 years old, Shooter and...
part) and Linwood;
Tonganoxie
Tonganoxie
47
42
45
46
44
10
43
40
36
33
39
121
14
15
26...
Senate District 26
Sedgwick County: Cities: Cheney, Clearwater(part), Derby(part), Garden Plain, Goddard...
History: L. 1974, ch. 130, § 8; March 26....
seq., and amendments thereto, an
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26... 34
35
36
HB 2489—Am. by HC
2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26... accident
HB 2489—Am. by HC
3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26... (E) the
HB 2489—Am. by HC
4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26... HB 2489—Am. by HC
7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30...
30
31
32
33
34
35
36
HB 2128
2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26... (11)
(9)
HB 2128
3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26... 37
38
39
40
41
42
43
HB 2128
5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26... internal
HB 2128
6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26... the notice of
HB 2128
9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26...
33
34
35
36
SB 31—Am. by SC
2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26... 9)
SB 31—Am. by SC
3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26... 40
41
42
43
SB 31—Am. by SC
5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26... (ii)
SB 31—Am. by SC
7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26... SB 31—Am. by SC
11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30...
KSH #24 Nimitz Stone Repair/Tuck Pointing
KSH #25 Museum/Library Stone Repair/Tuck Pointing
KSH #26... the builidng,
all new windows installed, the wood floors and cabinetry redone, and created some new... Project Priority: I26
Agency:
lvisit later in... Roofing: Install 26-gauge colored corrugated steel panels on the roof purlins to create a roof cover...
Hazardous Materials Abatement- Salina
Salina Campus hazardous materials abatement
26.... Refurbish Restrooms in Various Campus Buildings
Continue to upgrade campus restrooms with new fmishes... Phase I
New finishes, ceiling, and lights, and reconfiguring to add group study areas
and rooms... lay-in tile
and grid and new LED light fixtures
14.... Stair Rails at Gross Coliseum
Install new, segmented handrails to upper level seating which adjoins...








